Select Page

A back belt fire disrupts trains and autos.

back belt fire

courtesy NOFD

Back Belt fire

A back belt fire broke out on the Canal Boulevard underpass on Monday, 2-October-2023, around 6pm. NOFD documented the fire on Twitter. By Wednesday, 4-October, the damage to the tracks appears to be repaired.

I learned of the incident on Tuesday, when I went to my regular coffee shop, PJ’s, at 5555 Canal Boulevard. The coffee shop stands right next to the underpass. One of the baristas showed me video taken by the barista working Monday evening. Crazy!

Track damage

back belt fire

courtesy NOFD

The New Orleans Terminal Company (NOTC) constructed “Back Belt” in 1908. It got its name because it’s in the “back” of town relative to the “Public Belt” tracks which run along the river. Southern Railway acquired NOTC in 1916. Southern later merged to become present-day Norfolk-Southern Railroad. In 1939-1940, the Works Progress Administration built a series of underpasses along the Back Belt. The tracks have no grade crossings for its entire run through the city. So, the coffee shop offers a great vantage point for train-watching.

NOFD reported they do not know what caused the fire. Heat warped the track towards the eastern end of the underpass.

back belt fire

Amtrak Crescent #20, 3-Oct-2023

When Amtrak’s Crescent departed town on Tuesday morning, the train came out of the access track that runs along I-10 (between the highway and the cemeteries). When it approached the underpass, the train backed up, so it could cross over to the northern track on the Back Belt.

Repairs

By Wednesday, the tracks appeared to be repaired as a westbound train pulled by Union Pacific engines moved across the underpass. An eastbound CSX train crossed at the same time.

Normal?

Here’s this morning’s Crescent #20, crossing over the repaired tracks. Caption from YouTube:

Amtrak’s Crescent #20, ten minutes out of Union Passenger Terminal (NOL). AMTK 199, a P-42 Genesis, and AMTK 164, painted in “Phase IV Heritage” livery. Standard consist, two Genesis, 3 Viewliner coaches, 1 cafe, 2 sleepers, and a bag-dorm bringing up the rear. The train’s moving slower than normal out of concern for the rail replacements made on 3-Tues-2023 because of a track fire.

So, freight and passenger traffic appears to be back.